Home > News > News

Jiangxi Hylan Power Established

Jan. 20, 2021

In November 2019, Shenzhen Longtiger's 18650 cell manufacturing base Jiangxi Hylan Power was established. The manufacturing base is located at the side of the beautiful Xiujiang River. With a total 30 mu of construction land,among which 40000 square meters of area has been constructed, this manufacturing base reached a total 220M Yuan investment and a daily production capacity of 800K 18650 cells in the first phase. The second phase's  investment will be extra 280M Yuan, realizing an annual value of more than 1 billion Yuan.


Factory Buildings

确认4.jpg


High-end Cell Manufaucturing Equipments

确认4.jpg


High-end Cell Assembling Equipments

确认4.jpg


Cell Formation Workshop&Cell Capacity Grading Workshop

确认4.jpg

Contact Us

E-mail: xiaohuixian@ltgbattery.com

Mobile: +86 159 8956 2792

WeChat: +86 159 8956 2792

WhatsApp: +8615989562792

Add.: Office:Room 405, No. 1 of Shanghenglang 4th Industrial Zone, Henglang Community, Dalang district, Longhua District, Shenzhen Factory:Room 201, No.45 Tongga Road,Xiancun,Dalang,Town,Dogguan

Follow Us

Copyright © Shenzhen Longtiger Technology Co., Ltd. All Rights Reserved. | Sitemap | Technical Support: REANOD
Delete
Chat with Us